June 2009 Lodge work begins

Jeff and Dan's goal is to turn this empty shell of a pole barn into a habitable lodge for our families with a garage and work space in the back.
The first step was to dig holes and pour concrete for the floor footings.

Looking out the front door

Looking towards the rear garage door